Skip to main content
IPSC / USPSA / 3-Gun

Train Smarter.
Shoot Faster.
Win More.

The all-in-one sport shooting app for IPSC, USPSA, and 3-Gun competitors. Track your armory, manage ammunition inventory, time drills with a par timer, and watch your shooting skills improve.

Download on the
App Store
SOON

Start your 7-day free trial today.

Ranger app home screen showing training dashboard with skill progress and upcoming sessions
Features

Everything You Need for Competitive Shooting

From your armory to the range, Ranger keeps every detail organized so you can focus on what matters — putting rounds on target.

Extensive Drill Library

47 built-in drills covering every competition skill — from Bill Drills to El Presidente. Create custom drills, tag by skill category, track metrics per drill, and build a library tailored to your training goals.

47 Built-in DrillsCustom DrillsSkill TaggingMetric Tracking
Ranger app Extensive Drill Library screen
Dry Fire
Par Time

Wall Drill

Trigger control & sight stability at home

FundamentalsTrigger Control
VR Training
Hit Factor

VR Stage Execution

Full stage practice in virtual reality

Stage PlanningMovement
Range - Static
Hit Factor

El Presidente

The classic competition accuracy drill

TransitionsReloadAccuracy
Range - Dynamic
Hit Factor

Box Drill

Movement between 4 positions with engagement

MovementShooting on Move

47 built-in drills across 9 skill categories. Plus create your own.

AI-Powered Plan Builder

Tell Ranger your goals, available time, and ammo budget. The AI generates personalized multi-week training programs tailored to your division, skill level, and match schedule. Micro plans for single sessions. Macro plans for season-long improvement.

Personalized PlansMatch-AwarePeriodizationMicro & Macro
Ranger app AI-Powered Plan Builder screen

Session Builder

Four training modes — Dry Fire, VR, Range Static, and Range Dynamic. Build structured sessions by combining drills, set round budgets, and track performance per exercise. Every rep feeds your skill profile, and Ranger automatically detects personal records as you improve.

4 Training ModesPersonal RecordsRound Tracking
Ranger app Session Builder screen
More Tools

Gear & Schedule Management

Keep your equipment tracked, your ammo counted, and your calendar organized.

Your Armory, Always Ready

Track every firearm in your collection. Monitor round counts, set cleaning schedules, manage spring replacement intervals, and keep photos of your gear.

Round TrackingCleaning AlertsSpring IntervalsPhoto Gallery
Ranger app Your Armory, Always Ready screen

Know Your Ammo, Down to the Round

Real-time ammunition inventory with cost-per-round tracking, consumption projections, and low-stock alerts. Link usage to specific firearms.

InventoryCost TrackingUsage ProjectionsLow Stock Alerts
Ranger app Know Your Ammo, Down to the Round screen

Your Shooting Life, Organized

A color-coded calendar that unifies matches, training sessions, dry fire practice, and maintenance reminders. See your month at a glance and never miss a registration deadline.

Match SchedulingColor-Coded EventsRemindersAt-a-Glance View
Ranger app Your Shooting Life, Organized screen

A Par Timer in Your Pocket

Visual par timer with configurable random delay, haptic feedback, and built-in presets for common drills. Set par times for draws, reloads, and transitions. No need to carry a separate shot timer to the range — Ranger puts one in your phone.

Random DelayHaptic BuzzPresetsCustom Times
Ranger app A Par Timer in Your Pocket screen
Progress Tracking

Track Your Shooting Progress

Every drill you log feeds into your skill profile. Track trends over time, celebrate personal records, and identify weak areas before your next IPSC or USPSA match.

Ranger app skills overview with progress charts

Trend Analysis

See whether you're improving, plateauing, or declining across every skill category.

Personal Records

Automatic PR detection with celebration notifications. Know the moment you beat your best.

Skill Categories

14 skill categories from fundamentals to mental game, each with sub-skills and detailed metrics.

Pricing

Start Free, Go Pro When You're Ready

Try Ranger Pro free for 7 days. No credit card required to start.

Ranger Basic

Free
  • Track 2 guns & 2 ammo types
  • Track statistics of 11 skills
  • Calendar
Get Started
7-DAY FREE TRIAL

Ranger Pro

$7.99/month

or $49.99/year (save 48%)

  • Everything in Basic
  • Full drill library (expanding) + custom drills
  • AI-powered plan builder
  • Advanced session builder
  • Detailed statistics & progress tracking
  • Cloud sync across devices
  • Priority support
Start Free Trial
Reliability

Your Data, Everywhere, Always

Offline First

Train without signal. Your data syncs automatically when you're back online. The range doesn't need Wi-Fi.

Real-Time Sync

Switch between devices seamlessly. Your armory, ammo counts, and training history follow you.

Your Data, Your Control

Your data lives on your device first. No social media spam. No data selling. Just training tools.

Testimonials

What Shooters Are Saying

“I used to track everything in spreadsheets. Ranger replaced all of that in one app. My round counts are always accurate and I never forget to clean my gear.”
Mike R.
Production Division, A-Class
“The par timer and drill library alone are worth it. Having preset times for draws and reloads keeps my dry fire sessions focused.”
Sarah K.
Limited Division, B-Class
“Finally an app built by someone who actually shoots. It tracks the things that matter — hit factors, par times, skill trends. Not generic fitness metrics.”
James T.
Open Division, M-Class
FAQ

Frequently Asked Questions

What is Ranger?+
Ranger is a companion app designed for competitive sport shooters. It helps IPSC, USPSA, and 3-Gun competitors track their armory, manage ammunition inventory, time drills with a built-in par timer, and monitor skill progress over time.
Is Ranger free to use?+
Ranger Basic is completely free and lets you track 2 firearms, 2 ammo types, and 11 skills with a calendar. Ranger Pro unlocks the full drill library, AI-powered plan builder, advanced session builder, detailed statistics, and cloud sync for $7.99/month or $49.99/year. Every Pro subscription starts with a 7-day free trial — no credit card required.
What shooting drills are included?+
Ranger includes 47 built-in drills across 9 skill categories — from fundamentals like the Wall Drill to competition classics like El Presidente and Box Drill. Drills cover dry fire, VR training, static range, and dynamic range modes. Pro users can also create unlimited custom drills.
Does Ranger work without an internet connection?+
Yes. Ranger is offline-first — all your data is stored locally on your device and works without signal. When you reconnect, Ranger Pro automatically syncs your data across devices.
What platforms is Ranger available on?+
Ranger is currently available on iOS. An Android version is in development.
How does the AI training plan builder work?+
Tell Ranger your goals, available training time, and ammo budget. The AI generates personalized multi-week programs tailored to your division, skill level, and match schedule — with both micro plans for single sessions and macro plans for season-long improvement.

Ready to Level Up Your Game?

Join competitive shooters who are training smarter with Ranger.

Download on the
App Store
SOON

7-day free trial. $7.99/month or $49.99/year. Available on iOS. Android coming soon.

Download Ranger